Mauritius Central Electricity Board
Gilkes have supplied 36 turbines to Mauritius from as far back as 1902 and have since provided a range of plant modernisation services to rehabilitate the installations back to their optimum working levels.
Gilkes turbines have an unparalleled life span. However, at some point during the life of a hydro scheme, there will undoubtedly come a time where plant modernisation will be required and certain aspects will have to be replaced, refurbished or upgraded.
Back to all case studies